Our brief was to fit out this welcoming, calming, and spacious #salon for clients to come and take time out to unwind. Full fit-out of the salon, including all-new high-end bespoke joinery, coffee station, decoration, flooring, and mechanical works. When we say a high-end finish…..we mean a high-end finish!
SQ. FT
BUDGET
WEEKS TURNAROUND
8 Luxury boutiques.
When we first started with this project the space was just a shell & core. We went into serious details with the mechanical & electrical (lighting), plaster work, high-end finished joinery, fixtures & fittings plus a lot more. We brought in some high-calibre subcontractors to help us bring this luxury boutique to fruition.
(Check out our Linkedin page to see the project in full)
SQ. FT
BUDGET
MONTHS TURNAROUND
It’s safe to say Griolladh have changed the toastie game in Dublin since they first launched in 2020. While they started off running out of food trucks at different markets and locations, they opened their first brick and mortar in 2022.
Griolladh have officially launched their Central Plaza store and we wore delighted to have been apart of their journey so far.
SQ. FT
BUDGET
WEEKS TURNAROUND
We have had the honor once again to be involved in this project with Paul Sheeran. Another of Paul Sheeran Jewellers‘ luxury boutiques has opened its first-ever standalone store in Dublin.
Quick speed turnaround which comprised of a complete strip out back to shell. A full M&E install, Floor, wall & ceiling finishes throughout. Full shop and upstairs office joinery fitout
SQ. FT
BUDGET
WEEKS TURNAROUND
Roccul worked through snag lists provided and kept a record of the condition of each room/ space as you find it. We provided management costs/prelims on a weekly basis, timesheets for labour, schedules of all materials/products purchased and associated costs.
Works included: corridor walls and skirting prepped and painted, red walls re-painted and varnished, iron holders installed, tiled skirtings installed, small snags to rooms completed, small paint touch ups done (we have previously painted these rooms, carpet install, supply art work, repair leaks).
ROOMS
BUDGET
WEEKS TURNAROUND
The Works included Refurbishment of building to include fire compartment upgrade as set out in report prepared. Upgrade to floors, Lift shaft, service risers and existing fire doors. New electrical and mechanical installation including fire alarm, emergency lighting. Flooring and decoration works and fitout of bars and W/Cs.
SQ. FT
BUDGET
WEEKS TURNAROUND
Roccul have completed the Guud Day Coffee shop located right beside the new Hilton Hotel directly across from the Four Courts, Dublin. ☕️
This was a turn-key project from Shell and core consisting of, a new M&E install, dry lining, floor + wall finishes, and a high-end joinery installation.
As always this project was turned around within the given budget and timeframe set by the clients.
SQ. FT
BUDGET
WEEKS TURNAROUND
Alterations and new installation to the Gym and Pool Level Changing Rooms at Google Docks, to include new floor and ceiling finishes throughout.
SQ. FT
BUDGET
WEEK TURNAROUND
Lennans Yard is one of Dublin’s premier restaurant and bars. Roccul were instrumental in delivering all aspect of the project.
From the demolition and rebuild of the rear of No.20 to all interior finishes to The Coach House
SQ. FT
BUDGET
MONTHS TURNAROUND
The Big Tree is a very popular pub on Dublin’s north side. Our brief was a complete refurbishment of the bar and the install of a full service kitchen to service it. All elements of builders works, M&E, joinery and finishes were carried out by Roccul.
SQ. FT
BUDGET
WEEKS TURNAROUND
The works comprised of a high-end refurbishment and upgrading of 396 bedrooms and the associated corridors across the Clayton Hotel Dublin Airport and Clayton Hotel Liffey Valley.
BEDROOMS
BUDGET
MONTH TURNAROUND
Iveagh Gym is a protected structured building and had to be kept operational at all times, which makes the works challenging to say the least.
The work comprised the refurbishment, design and joinery & decoration.
SQUARE FEET
BUDGET
WEEKS TURNAROUND
Cocu is a health and food restaurant located in Baggot Street, Hatch Street, and Ballsbridge.
All works undertaken by Roccul on their 3 different branches were delivered on time and within budget
These works included the upgrade to existing M&E, joinery & decorations.
LOCATIONS
BUDGET
WEEKS TURNAROUND